Please join Erie-Niagara Chapter NYSSPE for this Joint Meeting with the Western Region ACEC and ASCE Buffalo Section.
The Buffalo Bills are constructing a new stadium facility to replace the existing Highmark Stadium. This presentation will describe the sanitary collection system design process for the new stadium, including the existing stadium sewer configuration, flow monitoring methodology and results as they pertain to sizing the new sanitary sewers, structural evaluation of the existing attenuation tank, and sewer design parameters and routing considerations.
1 PDH pending
Jaime M. Davidson, PE
JM Davidson Engineering, DPC